|
This work was done onsite at Airbus Filton on A300 Freighter for UPS. The aim of the task was to determine that the proposed wing box modification for an aircraft weight increase in weight is viable. Hand analysis methods used.
|
|
Last Updated ( Dec 24, 2007 at 11:47 AM )
|